Transient Analysis

Forum for OpenSees users to post questions, comments, etc. on the use of the OpenSees interpreter, OpenSees.exe

Moderators: silvia, selimgunay, Moderators

Post Reply
Araj
Posts: 26
Joined: Thu Jul 15, 2004 5:20 am

Transient Analysis

Post by Araj »

Hello,

This is regarding Transient Analysis. I am analyzing a reinforced concrete frame.

While I perform Transient Analysis, the analysis terminates before the Full time.

My total time for analysis is 20 seconds, but the message appears that the analysis failed at time 7.1 seconds. I can still get the output but only upto this time step.

Can it be implied that the structure has failed within the time I have assigned or there can be any other reasons for this.

If my structure has failed within my full time limit, is there any method by which I can monitor which of my frame members has failed and the mode of their failure (Flexure or Shear).

Any help in this matter will be appreciated.

Thank you,

With Regards,
Aloke
fmk
Site Admin
Posts: 5884
Joined: Fri Jun 11, 2004 2:33 pm
Location: UC Berkeley
Contact:

Post by fmk »

have you looked at Example3.3 & tried some programming to get around the failure?
Post Reply