Hi, I would like to see more references on the Concrete 02 behaviour.
I am having a hard time to understand how the unloading process works in the hysteresis. I can see the difference between Concrete 01 and Concrete 02, but how do the unloading and the reloading are defined?
Concrete 02 Material behaviour
Moderators: silvia, selimgunay, Moderators