Hi everybody,
To impose a dynamic load ( sinusoidal loading ) at pile head I used the Sine time series for Load pattern and the transient analysis for analyzing. But results showed that the maximum load imposed at pile head is much greater than the input. What is the problem? Is there any other way to model a dynamic loading?
Thanks,
Dynamic loading
Moderator: Moderators
-
- Posts: 25
- Joined: Tue Nov 11, 2008 4:43 am
- Location: University of British Columbia
- Contact:
Dynamic loading
Amin Rahmani