Forum for OpenSees users to post questions, comments, etc. on the use of the OpenSees interpreter, OpenSees.exe
Moderators: silvia , selimgunay , Moderators
leexian
Posts: 6 Joined: Fri Jun 20, 2008 10:48 am
Location: CHINA
Post
by leexian » Fri Jun 20, 2008 11:01 am
hello,
i have a problem that i have to reduce the period of frame in the time history analysis considering the effect the mansory infill wall. can anyone tell me how to do that ?thanks.
silvia
Posts: 3909 Joined: Tue Jan 11, 2005 7:44 am
Location: Degenkolb Engineers
Contact:
Post
by silvia » Sat Jun 21, 2008 10:31 pm
try to model the walls
Silvia Mazzoni, PhD
Structural Consultant
Degenkolb Engineers
235 Montgomery Street, Suite 500
San Francisco, CA. 94104
amin_asareh
Posts: 15 Joined: Sun Dec 17, 2006 2:21 am
Location: kntu university of technology
Post
by amin_asareh » Mon Jun 23, 2008 1:22 am
Period of a structure is related to the mass and stiffness. you can change the period by changing the mass or stiffness.
ASAREH