Search found 8 matches
- Mon May 02, 2011 11:52 am
- Forum: OpenSees.exe Users
- Topic: Manually Controlling Time Steps in OpenSees
- Replies: 2
- Views: 2615
Re: Manually Controlling Time Steps in OpenSees
Thanks Frank. But for using OpenSees in hybrid simulations, I guess you have to be able to control timesteps in simultaneous integration times between programs. How does OpenSees work there? Is there a way to keep OpenSees open during each analysis that is comunicated between multiple programs? Shou...
- Tue Apr 26, 2011 11:11 am
- Forum: OpenSees.exe Users
- Topic: Manually Controlling Time Steps in OpenSees
- Replies: 2
- Views: 2615
Manually Controlling Time Steps in OpenSees
Hi all,
Does anyone know if there is a way from TCL to manually control time steps in OpenSees? In particular, can you step back a time step to re-try an analysis of the current time step?
Thanks
Amin
Does anyone know if there is a way from TCL to manually control time steps in OpenSees? In particular, can you step back a time step to re-try an analysis of the current time step?
Thanks
Amin
- Wed Apr 20, 2011 4:50 pm
- Forum: OpenSees.exe Users
- Topic: Goingto a previous timestep while running transient analysis
- Replies: 2
- Views: 2620
Goingto a previous timestep while running transient analysis
Hi I'm trying to do hybrid simulations with OpenSees and I would like to know if anyone has tried to put the transient analysis into a loop that can come back and forth between timesteps and probably change the data for some timesteps according to the iterations related to the results of some other ...
- Mon Apr 18, 2011 10:09 am
- Forum: Soil Modelling
- Topic: Pressure Dependent material
- Replies: 3
- Views: 4753
- Wed Mar 16, 2011 9:06 pm
- Forum: OpenSees.exe Users
- Topic: running many integrators in one time step
- Replies: 4
- Views: 3615
Re: running many integrators in one time step
Thanks for your help. I got it now. It's working properly like this: wipe; # Unit --------------------------------------------------------------------- # Force : KN # Length: m # -------------------------------------------------------------------------- # --------------------------------------------...
- Wed Mar 16, 2011 3:15 pm
- Forum: OpenSees.exe Users
- Topic: running many integrators in one time step
- Replies: 4
- Views: 3615
Re: running many integrators in one time step
Thank you for your reply. I changed my code as you said, But it is not working. The constrain handler does not accept "plain". I changed it to other constrains but I'm still getting zero for all the outputs. I only have one value in the files "dispx", "dispY"... and I o...
- Tue Mar 15, 2011 3:42 pm
- Forum: OpenSees.exe Users
- Topic: running many integrators in one time step
- Replies: 4
- Views: 3615
running many integrators in one time step
Hi all I have a cantilever column modeled and I want to apply 6 displacements in 6 directions at the free end of the column at once. The displacements are achieved from some other program in separate files (dispx.dat, dispy.dat,...). I have to get the reaction forces from opensees for the 6 directio...
- Thu Sep 17, 2009 12:58 pm
- Forum: Soil Modelling
- Topic: OpenSees Version 2.1:mass density of soil
- Replies: 16
- Views: 46106